Photo gallery
See Cheadle Lake Park
3 photos
Select any photo to view it larger with its creator, source, and license.
The place
About Cheadle Lake Park
Cheadle Lake Park is a large lake, shoreline and trail landscape on Lebanon's south side, about two straight-line miles from the Santiam Excursion depot. The city's trail map connects north- and south-shore routes, and the site has long supported walking, bicycling, wildlife viewing, fishing and major community events.
The park is in a two-phase capital project during 2026. The current project page says Weirich Drive work is complete and lists a new parking lot, fencing and utilities among completed Phase 2 work. It also lists multi-use paths and lighting, access-road paving, stage-area accessible parking, a north restroom and entrance gates as remaining work through November.
A March 26 city notice separately says Weirich Drive parking lots are closed to pedestrians and vehicles through summer, directs trail users to parking on River Road, and asks visitors to remain on designated trails and avoid park grounds. The newer completed-work list does not expressly rescind that notice, so visitors should ask Engineering which entrance and facilities are open that day.
The project goal is a fully accessible year-round park, but a goal is not a completed access fact. Until remaining paths, parking and restroom work is finished and the city updates the closure, do not promise a continuous step-free route or usable restroom.
What stands out
Take a close outdoor pause
The lake adds open space and wildlife viewing without a long drive from the depot.
Read an industrial landscape
The former log-pond and current restoration story adds land-use context to Lebanon's working railroad setting.
Use the trail network carefully
North- and south-shore trail connections exist, but construction instructions control the usable route in 2026.
Separate goals from current access
New accessible infrastructure is the project's objective; only completed, reopened facilities should shape a mobility plan.
Pair it with the train
Why it belongs in a Santiam Excursion Trains trip
Cheadle Lake is the closest substantial independent outdoor companion to Santiam Excursion Trains. Use it before or after a ride only when weather and the city's current construction access support the plan; the train leaves on time and doors open 30 minutes ahead.
Before you go
Plan your visit
- 2026 projectPhase 2 runs March-November; paths, lighting, access-road paving, stage ADA parking, north restroom and gates remain on the current work list
- Access noticeThe March 26 city notice directs trail users to River Road parking and says Weirich lots and park grounds are closed during construction; confirm whether it remains active
- Completed workThe newer project page lists parking-lot paving, drainage, entrances, striping, lighting, fencing and some utilities complete, but it does not explicitly reopen an entrance
- What to doStay on designated trails, respect construction fencing, and use the latest city instruction rather than a historical photo or event exception
- AccessibilityFully accessible paths, parking and restroom are project goals with remaining work; do not assume the final chain is complete
- ConditionsOpen water, exposed shoreline and changing surfaces make weather and footwear part of the plan
- City contactEngineering: 541-258-4923 or engineering@lebanonoregon.gov for current access
- Train timingBe back at 750 South Third Street before doors open 30 minutes ahead; the train leaves on time
Continue through working history
Add Thompson's Mills State Heritage Site
Add a free operating-mill tour and 160 years of rural production and transportation history.
Useful answers
Frequently asked questions
Is Cheadle Lake Park open normally in August 2026?
Do not assume normal access. The project page shows work completed and work remaining, while a March notice directs trail users to River Road and closes Weirich lots and park grounds through summer. Confirm with Engineering.
Where should I park?
The active construction notice directs visitors to the River Road parking area. A newer page lists a parking lot complete but does not explicitly revoke the closure, so verify before choosing an entrance.
Are the new accessible facilities finished?
Not all of them. The current remaining-work list includes multi-use paths, stage-area ADA parking and a north restroom.
Can I leave the designated trail?
The city asks visitors to remain on designated trails and avoid park grounds while construction is underway.
How far is the park from the train?
About 2.0 miles straight-line. Driving distance and the usable construction entrance will differ.
Who can confirm current access?
Lebanon Engineering lists 541-258-4923 and engineering@lebanonoregon.gov for questions and concerns.
Trust and accuracy
Sources
Source checked 2026-08-15. This free guide has not yet been confirmed by the venue. Current hours, prices, services, and accessibility can change; confirm time-sensitive details directly.
- Current City of Lebanon project page for phases, completed and remaining work, goals and Engineering contact →
- City construction notice for Weirich closure, River Road trail access and stay-on-trail instruction →
- City trail map for north- and south-shore trail context →
- Exact Cheadle Lake sunset image under CC BY 4.0 →
- Exact Cheadle Lake winter image under CC0 →
- Exact Cheadle Lake shoreline image under CC BY-SA 3.0 →